The Kunsthalle Mannheim – a „city within the city“

5 questions for


Mannheim’s Kunsthalle fundamentally differs from the old type of museums. The underlying design openly hints at the historical urban structure of Mannheim: Seven ‘exhibition houses’ surround a central atrium. The arrangement of several cubes generates multi-variant spaces through their array, heights and widths. There are exhibition cubes and galleries, alleys, bridges, planks, patios and a roof garden. The urban dynamics, methods and patterns are part of the museum experience. The Kunsthalle is a cosmopolitan space incorporating the surrounding city and at the same time incorporating itself through architecture, activities and a fascinating mix of experiences. Simultaneously the urban expanse flows into and through the museum. The approach to art and intelligent recovery is unobstructed. Inside the visitors easily find their way around, being able to focus on their interest and needs – arts, catering, bar, shop or a quiet corner for a time out amidst the exuberant daily routine. If the city is seen as a cultural agglomeration then “the city within the city” is a compacted cultural agglomeration, a concentrate and prime of the city surrounding it.

5 questions for Dr. Ulrike Lorenz, director of the Kunsthalle Mannheim

Picture gallery

Would the founding director of the Kunsthalle, Fritz Wichert, have liked the new building?

Absolutely, yes! He would have been delighted, because we are more or less directly implementing a core concept of his – in modern formal language. Wichert had planned to have an enormous central space beneath a high domed ceiling, which he called the “Hall of the City”. It was meant to be a place where the citizens of Mannheim could meet with friends, to talk and stroll together, before visiting the collections and galleries. We’ve got something very similar in mind for the new building.

In the future, the Kunsthalle won’t be presenting a conventional line-up of styles. How do you intend to present the masterpieces instead?

We are trying to view our 100 year-old collection as a sort of text, which can be read and re-read again and again, undergoing different interpretations. We’re “tickling” out various universal as well as currently controversial topics from our very differentiated collections – not only the well-known masterpieces of painting and sculpture, but also hidden treasures amongst the prints and drawings and from the design collections and the depots. The various exhibition locations in our “city within the city” will be set up to treat existential topics such as “remembering and forgetting”, “escape and displacement”, or “being and time”.

With which special exhibitions do you want to inaugurate the new museum?

Prior to Christmas 2017 we’ll be launching the “city within the city” with the extraordinary new presentation of the jewels of our collection. Then in spring 2018, we’ll kick off the first blockbuster exhibition, occupying more than 1,000 square meters: Jeff Wall, one of the most important conceptual photographers of our times – a pioneer and a classic at the same time. Fitting for the modern industrial city of Mannheim, the second special exhibition in the new Kunsthalle will take a look at the influence of the economy on the international art scene of the early 20th and early 21st centuries. Seen from the perspective of today’s crises, the exhibition will investigate artists’ ideas about work and its undoing, and about the relationships between man, machine, money and society.

Despite all of the organisational and curatorial challenges, what makes you the happiest?

It is exhilarating to be able to work on implementing a vision, to be designing something that will last and be socially valuable. I am very thankful for the tremendous support that we have received from the community and from the interested public, as well as for the wonderful work of my team. Everyone in this city is working towards the same goal: to make the impossible possible.

Why is art important to you?

When I imagine that a whole life enters a work of art, that artists put all of themselves into their work, then I feel that it is a huge privilege to acquire that, to be allowed to share in that. Art is like a battery, a reservoir of time, experience, doubts, certainties, and joy. When I dock into that, I am so much richer. That’s why, for me, nothing is possible without art.

Picture gallery

News
  • Komplexe Montage des Glasdaches ist abgeschlossen

    Am 20. Oktober ist es soweit: Die komplexe Montage des insgesamt 340 m² großen Glasdachs wird abgeschlossen. Das Dach spannt sich über das Tageslichtatrium im Herzen des Neubaus. In nur drei Tagen hat die Firma App aus dem Allgäu insgesamt 98 Glasscheiben mit Hilfe eines Autokrans über den 21,5 m hohen Rohbau gehievt und über dem zukünftigen Atrium installiert. 82 feste Elemente (jeweils 2,82 auf 1,07 m groß) und 16 bewegliche Flügelelemente (1,07 auf 1,40 m groß) ermöglichen, dass man im Herzen des Neubaus bei Tageslicht flanieren kann. Ein spezielles, dreifaches Isolierglas sorgt mit einer entsprechenden Wärmeschutzschicht für den Sonnenschutz, den die präsentierten Kunstwerke aus restauratorischen Gründen benötigen. Mit dem Glasdach wurde ein wichtiger Teil der Fassade geschlossen. Bis zum Ende des Jahres 2016 werden alle Lochfenster und Fensterbänder montiert sein und die Pfosten-Riegel-Fassade das Gebäude nach außen vollständig abschließen. Das wetterfeste Gebäude stellt nach der Fertigstellung des Rohbaus im Juli den zweiten, bedeutenden Meilenstein im Bauprozess des Neubaus der Kunsthalle Mannheim im Jahr 2016 dar.

    Außenbeleuchtung Test

2016

NEWS FROM

Besondere Außenbeleuchtung für die neue Kunsthalle

Die neue Kunsthalle wird ein filigranes Mesh umhüllen, eine schimmernde durchlässige Metallhaut. Damit dieses richtig zur Geltung kommt, wird ein maßgeschneidertes Lichtkonzept geplant. Das Mesh wird von unten her angestrahlt. Dafür wird rund um die Kunsthalle etwa alle 2,20 Meter eine LED-Leuchte in den Boden eingelassen. Ein erster Test hat gezeigt, dass die eingeplanten Lampen die gesamte Fassadenhöhe von gut 21 Metern erhellen können. An der oberen Gebäudekante geht die Beleuchtung dann sanft in den nächtlichen Himmel über. „Es hat funktioniert und wir waren alle total begeistert", schwärmt Dr. Ulrike Lorenz über die geplante neue Außenbeleuchtung.

Außenbeleuchtung Test

NEWS FROM 31.08.2016 Der Neubaukomplex ist eingerüstet (Kopie)

NEWS FROM

Der Neubaukomplex ist eingerüstet

Erste Fenster werden eingesetzt und Faserzementplatten auf die Betonwände als Wärmedämmung angebracht. Die Arbeiter montieren auch die Pfosten-Riegel-Fassade als Unterkonstruktion für die spätere Mesh-Fassade. Als „Stadt in der Stadt“ versteht sich der Neubau mit seinen rechteckigen und kubischen Formen als gebaute Hommage an die barocke Quadratur Mannheims. Die einzeln stehenden sieben Beton-Kuben werden später mit einer transluzenten metallenen Fassaden-Hülle umfangen, dem sogenannten Mesh. Das filigrane Drahtgeflecht wird nach der Frostperiode voraussichtlich im März 2017 installiert. Wir danken Herrn Peter W. Ragge vom Mannheimer Morgen für den Bericht zum aktuellen Baugeschehen.

Webcam Kunsthalle Mannheim

NEWS FROM 14.06.2016 Jahrespressekonferenz Stiftung Kunsthalle Mannheim

NEWS FROM

Annual press conference Foundation Kunsthalle Mannheim

A vision has become reality: The Kunsthalle's framing work has reached its peak. The architectural idea of a museal city within in the city now is visible from afar. A good moment for the builder-owner Foundation Kunsthalle Mannheim to give an update on the construction process and take a look ahead.

Current construction procsess
According to plan the framing construction is in its final stages. All outer walls have now reached their final height of 21.5 m. In addition to 10.500 m3 of concrete, 2.000 tons of steel were used. The toppinng out ceremony is scheduled for July 1st, 2016. The foundation is very pleased with the high quality of the workmanship of the concrete work. Already at this stage of the framing work the design idea of "the city within a city" shows clearly. This pictorial motif, immanent to common life experience, is the core of the new building communication due around mid 2016. Open to all citizens the Kunsthalle aims at offering an experience for all senses: dreaming, strolling, eating, shopping, enjoying art  or  the view onto Friedrichsplatz.

Budgetting the new building
On the occasion of the annual press confernence of the Foundation Kunsthalle Mannheim the surprise-guest-cum-founding-member and splendid patron of the new building Dr. h.c. Hans-Werner Hector was happy to announce that his foundation  H.W. & J. Hector Stiftung will furthermore support the Kunsthalle Mannheim. From 2018 on the Kunsthalle Mannheim will receive an annual support of 400.000 € for their scientific and artistic programme. With this generous ten year contract 4 million Euros will be available for programme work until 2027.

Operating the museum
Related to the building process of 2017 the Kunsthalle wishes to infom its visitors of the temporary closing of the art exhibition. The special exhibiton 'Brückenzeit' on Fritz  Schwegler and the presetation of the collection ARCHE will be closed as of  January 8th 2017. During this time the Kunsthalle will be focusing on virtual activities and offer the event series "Talk of the town". The art noveau wing will receive a technical and structural make over to allow a smooth crossing into the new building.
Furthermore the remaining deficiencies from the general refurbishment need to be remedied and the historic showrooms will receive a digital update. Additionally the closing time will allow for the restoration of contemporary works of the 20th century which will be on display in the new building.

2015

NEWS FROM

Baugespräch Herbst 2015

Der Neubau der Kunsthalle Mannheim verläuft planmäßig. Man kann derzeit dabei zusehen, wie der Rohbau in die Höhe wächst. „Nach wie vor liegen die Kosten der Arbeiten am Neubau im Budget“, erklärt Hanno Diehl, Bauvorstand der Stiftung Kunsthalle Mannheim. Bisher sind 72 Prozent der Vergaben für die Baugewerke unter Dach und Fach. Die nächsten Meilensteine beim Rohbau sind im April 2016 die Fertigstellung des Rohbaus und das Richtfest am 01. Juli 2016, wenn das Dach abgedichtet ist. Voraussichtlich im September 2016 steht dann das wetterfeste Gebäude, die geschlossene Fassade (noch ohne Metallgewebe) ist fertig.



Der Innenausbau beginnt Anfang 2016 mit etwa drei Monaten Verzögerung. Zum einen konnte der Abriss aufgrund von Landtagspetitionen erst verspätet starten. Zum anderen dauerte die Vorbereitung der Baugrube länger, da der Weltkriegsbunker Planer und Bauarbeiter mit einer zweiten Bodenplatte überraschte. Nach bisherigen Erkenntnissen bleiben die Verzögerungen aber ohne Auswirkung auf den Fertigstellungstermin des Neubaus der Kunsthalle Mannheim Mitte 2017 und auf die Eröffnung des Kunstmuseums am Friedrichsplatz. Sie wird – nach dem Rückzug der Sammlung und der Einrichtung der Ausstellungen – planmäßig Ende 2017 stattfinden. Die größte Zeitersparnis erhofft man sich durch parallele Arbeitsschritte auf der Baustelle. So beginnt beispielsweise die Fassadenerstellung Anfang 2016 bereits zeitgleich zur Fertigstellung des Rohbaus. Das Aufmaß der Fassadenfirma folgt geschossweise den Rohbauarbeiten.



Geplant ist, das Gebäude nach Fertigstellung des Rohbaus im April 2016 sehr schnell wetterfest zu machen, damit der Innenausbau beginnen kann. Eine so genannte „Pfosten-Riegel-Fassade“ mit Fenstern schließt die „Löcher“ des Rohbaus an allen Seiten ab. Die Installation der Heizungsrohre im Untergeschoss beginnt noch bevor Anfang 2016 das Dach geschlossen wird. Dasselbe gilt für die Gewerke Lüftung und Sanitär. Bis März 2016 wird der Bauvorgang daher noch sehr viel komplexer, weil eine Vielzahl von Firmen parallel arbeiten und gesteuert werden muss.

NEWS FROM 26.08.2015 Ein Jahr nach Beginn der Abrissarbeiten

NEWS FROM

Ein Jahr nach Beginn der Abrissarbeiten

Eine kleine Bewegung für den Bagger, eine große Bewegung für die Mannheimer Museumslandschaft: Vor einem Jahr, am 26. August 2014, „biss“ ein 49-Tonnen schwerer Longfront-Bagger das erste Mal in den Mitzlaff-Bau ‒ die heiße Phase des Abbruchs war eingeläutet. Ein Jahr später ist von dem Bagger mit Abbruchschere und dem Ausstellungshaus aus den 1980er Jahren nichts mehr zu sehen: Ca. 35.000 Tonnen Bauschutt und 30.000 Tonnen Erdreich wurden abgefahren und haben Platz gemacht für den Rohbau des neuen Gebäudes, der bereits das Erdgeschoss erreicht.

So wurden an der Roonstraße bereits Schalbretter für das erste Teilstück der Kellerdecke angebracht, das nun zügig gegossen wird. An der Tattersallstraße arbeiten die Bauarbeiter hingegen noch eine Etage tiefer: Dort wird bis zum Monatsende die 4.000 Quadratmeter große Bodenplatte fertiggestellt, die gleichzeitig als Fundament dient.

Durch das verschränkte Arbeiten, also die gleichzeitige Erledigung unterschiedlicher Arbeitsschritte auf dem Baufeld, werden bereits im September an der Ecke Roonstraße / Friedrichsplatz die ersten Wände des Erdgeschosses über den Bauzaun ragen. Im Oktober soll dann die Kellerdecke das gesamte Untergeschoss bedecken ‒ zumindest fast. Denn im zukünftigen Eingangsbereich des Neubaus am Friedrichsplatz bleibt eine Aussparung für den 60 Meter hohen, roten Kran. Sie wird erst am Ende der Rohbauarbeiten, im Jahr 2016 geschlossen werden, wenn der Kran abgebaut ist.

NEWS FROM 04.08.2015 Erste Wände wachsen

NEWS FROM

Erste Wände wachsen

Es geht vorwärts auf der Baustelle des Neubaus. Nach einer scheinbaren Ruhephase, in welcher der Untergrund für den Neubau der Kunsthalle ertüchtigt wurde, geht es jetzt auf der Baustelle deutlich sichtbar voran. Knapp die Hälfte der insgesamt 2300 Quadratmeter großen Bodenplatte ist betoniert und die ersten Wände werden hochgezogen.

Rund 35 Bauarbeiter bereiten derzeit das Eisenflechtwerk für die Wände vor, bringen Schalwände in Stellung oder gießen den Flüssigbeton für die Bodenplatte aus. Dabei wird verschränkt gearbeitet: Während an der Westseite des Geländes, zur Tattersallstraße hin, noch am Fundament gearbeitet wird, ist an der östlichen Roonstraße bereits das Untergeschoss zu erkennen. Für den nötigen Nachschub sorgen derzeit zwei Baukräne auf dem Gelände. Der eine 46 Metern hoch, der andere 60 Meter ‒ unter seinem Arm hätte sogar der benachbarte Wasserturm Platz. Durch ihr genau abgestimmtes Zusammenspiel ermöglichen sie die parallelen Arbeiten auf der Baustelle und helfen so, sieben bis acht Wochen im Bauablauf wieder aufzuholen. Denn dieser Rückstand entstand durch Verzögerungen beim Abbruch des Bunkers.

NEWS FROM 23.03.2015 Grundsteinlegung des Neubaus

NEWS FROM

Grundsteinlegung des Neubaus

Der Grundstein ist gelegt 63 Zentimeter Länge, 15 Zentimeter Durchmesser und jede Menge Symbolkraft – das sind die Dimensionen der Zeitkapsel für den Neubau der Kunsthalle Mannheim, die Minister Nils Schmid am 23. März 2015 gemeinsam mit dem Bauherrn und Vorsitzenden der Stiftung Kunsthalle Mannheim, Dr. Manfred Fuchs, dem Oberbürgermeister der Stadt Mannheim, Dr. Peter Kurz und den Chefarchitekten Meinhard von Gerkan und Nikolaus Goetze im Grundstein versenkte. Neben dem grundlegenden Strategiepapier der Kunsthalle, der aktuellen Ausgabe des Mannheimer Morgens und einigen Euro-Münzen, wurden in die Kupferbulle auch Exemplare der wichtigsten Dokumente zum Neubau eingeschlossen.



Als „Kunst- und Kulturmetropole par excellence“ hat Nils Schmid, Finanz- und Wirtschaftsminister des Landes Baden-Württemberg, die Stadt Mannheim in seiner Rede bezeichnet. Oberbürgermeister Peter Kurz verwies auf die historische Dimension des Neubaus für die über 100 Jahre alte Kunsthalle Mannheim: „Nicht die Stadt, die Gesellschaft Mannheims baut hier in beispielhaftem Schulterschluss von privatem Mäzenatentum und öffentlicher Hand einen faszinierenden Ort für die Kunst und die Begegnung von Menschen. Wir können damit auch künftigen Generationen in würdiger Weise den Kunstschatz überliefern, den unsere Vorfahren mit Weitsicht, Finanzkraft und Glück erworben haben.“ Der momentane „Hausherr“ der Baustelle, Stiftungsratsvorsitzender Dr. Manfred Fuchs, sprach von einem „großen Tag für Mannheim, für die Metropolregion Rhein-Neckar, für die europäische Museumslandschaft und für die Kunst! Die Stiftung wünscht als Bauherr allen an diesem großen Vorhaben Beteiligten Erfolg. Möge es den "Bauleuten" gelingen, den Museumsbau in perfekter Qualität, in Termintreue, in budgetärer Disziplin und unfallfrei zu erstellen!“ Dipl.-Ing. Nikolaus Goetze, Partner im Architekturbüro von Gerkan, Marg und Partner, sprach über die architektonische Herausforderung: „Nicht nur, dass Museums-Neubauten derzeit absolute Ausnahmen sind, für uns ist die Mannheimer Kunsthalle auch das erste Museum dieses Ausmaßes in Deutschland.

Die Komplexität der Bauaufgabe, die Auseinandersetzung mit dem Ort und seiner Geschichte und die Beschäftigung mit ihrer Kunst sowie der intensive Dialog mit den Künstlern macht die Mannheimer Kunsthalle für uns zu einem der derzeit anspruchsvollsten Projekte überhaupt.“ Im Anschluss an den offiziellen Teil feierten die Projektbeteiligten zusammen mit Mitgliedern des Gemeinderats und des Förderkreises für die Kunsthalle Mannheim sowie den Anwohnern den gelungenen Startschuss für den Rohbau mit einer kräftigen Kelle aus der Gulaschkanone.

NEWS FROM 21.01.2015 54 Tonnen setzen Kunsthalle unter Strom

NEWS FROM

54 Tonnen setzen Kunsthalle unter Strom

Der erste reale Bau(fort)schritt in Richtung Neubau ist getan. Der Abriss des Tiefbunkers ist zwar in den letzten Zügen, aber am 21.01.2015 kam bereits die erste Lieferung für den Neubau der Kunsthalle Mannheim in der Tattersallstraße an: Die Kompaktstation zur Stromversorgung, an der der Hausbetrieb inklusive IT- und Klimatechnik hängt. Der 54 Tonnen schwere, schwarze Quader ist das neue elektrische Herzstück der Kunsthalle. In ihm werden in Zukunft zwei Transformatoren dafür sorgen, dass Jugendstil- und Neubau immer unter Strom stehen.

Die Funktion der Kompaktstation wird die gleiche wie bei einem kleinen Trafohäuschen am Straßenrand in einer Wohnsiedlung sein: Der ankommende Strom der MVV-Energie wird von 24.000 Volt auf 400 Volt umgespannt und in die Gebäudeteile der Kunsthalle geschickt. Dort kann er als Starkstrom abgenommen werden oder durch weitere Verteiler auf 230V für Standard-Steckdosen abgesenkt werden.



Nötig wird das eigene Trafohäuschen aufgrund des hohen Stromverbrauchs der Kunsthalle für Beleuchtungs- und Sicherheitstechnik. Sobald die Kompaktstation mit den Anschlüssen verbunden ist, wird die Station sofort ihre Arbeit aufnehmen und den Jugendstilbau und die darin laufenden Ausstellungen mit Strom versorgen. Für den Besucher ist sie komplett unsichtbar: Als so genannte Unterflur-Trafostation wird sie vollständig im Boden versenkt.

2014

NEWS FROM

Übergabe der Baugenehmigung

Baubürgermeister Lothar Quast übergab am 23. Dezember 2014 die Baugenehmigung der Stadt Mannheim in Form eines stattlichen Aktenordners an den Vorstand der Stiftung Kunsthalle Mannheim. Dem Bauantrag, der aus dem Zusammenschluss der Stiftung und der Kunsthalle eingereicht wurde, wird damit nach mehreren Abstimmungsterminen stattgegeben. Bei diesen Treffen konnte erreicht werden, dass die Anbindung vom Neubau an den Jugendstilbau behindertengerecht ausgestattet und auch den Anforderungen des Denkmalschutzes gerecht wird. Jetzt kann mit dem Neubau der Kunsthalle auf der Fläche des ehemaligen Mitzlaff-Baus begonnen werden.

„Für mich als Baubürgermeister ist es eine besondere Freude“, so Lothar Quast, „dass ich heute die Baugenehmigung für ein herausragendes Bauwerk an die Stiftung Kunsthalle Mannheim übergeben kann.“ Quast zeigte sich zudem beeindruckt vom Fortschreiten der Rückbaumaßnahmen. „Nach dem endgültigen Abriss des massiven Bunkers, der sich im vollen Gange befindet, können auf einem frischen Fundament die neuen Ideen in die Realität umgesetzt werden. Die Grundsteinlegung ist für Ende März 2015 vorgesehen“, so Quast zum weiteren Ablauf der Maßnahme. Durch die Unterstützung des Baustellenmanagements hat das Abbruchunternehmen gleich auf erste Anwohnerreaktionen zu Lärmfragen reagiert und die neueste Meißeltechnik, die es derzeit in Deutschland gibt, eingesetzt.

Zudem konnte erzielt werden, dass über die Weihnachtstage und zum Jahreswechsel die Baustelle ruhen wird. Zwischen dem 24. Dezember und dem 1. Januar 2015 wird es auf der Baustelle keine Bautätigkeiten geben. Zusätzlich zur Ruhe zwischen den Jahren, wird auch am Montag, 5. Januar 2015 nicht gearbeitet.



„Für ihre Geduld und ihr Verständnis für die Belastungen aus dem Baubetrieb danke ich ihnen sehr. Wir scheuen keine Bemühungen, um die Belastungen insbesondere für die Anwohner so gering wie möglich zu halten. Hierzu haben der Austausch der Abbruchwerkzeuge und die Bauruhe einen großen Teil beigetragen“, so der Baubürgermeister zu den durchgesetzten Maßnahmen.

NEWS FROM 11.11.2014 Hydraulikmeißel bricht massive Bunkermauern auf

NEWS FROM

Hydraulikmeißel bricht massive Bunkermauern auf

Heute durchbohrte der Abbruchbagger mit dem Meißel die Bunkerdecke unter dem ehemaligen Mitzlaff-Bau. 2,50 Meter dicke Mauern wurden so zum ersten Mal nach über 30 Jahren wieder sichtbar. Damit startete die letzte Phase des Abbruchs im Kunsthallen-Areal jenseits des denkmalgeschützten Jugendstilbaus, der weiterhin geöffnet bleibt. Auf der anderen Seite schafft die Stiftung Kunsthalle Mannheim Platz für den Neubau, der die gravierenden konservatorischen, klima- und sicherheitstechnischen Probleme ebenso lösen, wie neueste Forderungen an Brandschutz, Barrierefreiheit und Besucherorientierung erfüllen wird.

In den Kriegsbunker, der ab 2000 als Kunstdepot diente, drang Wasser ein – für Kunstwerke von unschätzbaren Wert ein unhaltbarer Zustand und für die Kunsthalle Mannheim ein unkalkulierbares Risiko. Deshalb wurde abgedichtet und verdämmt, doch es half alles nichts: Das Wasser trat immer wieder neu zum Vorschein. Die Ursachen sind bis heute ungeklärt und werden auf eine bauliche Besonderheit zurückgeführt.

Denn der Tiefbunker wurde im dritten Jahr des Zweiten Weltkriegs auf dem Gelände nördlich des Jugendstilbaus u-förmig angelegt. Bei der Planung des Mitzlaff-Baus entschied man sich Anfang der 1980er Jahre aus Kostengründen, das massive Bauwerk im Erdreich zu belassen und den Erweiterungsbau der Kunsthalle darüber zu setzen. Dabei überbaute man die Schutzräume nur zu etwa 40 Prozent und gründete den damaligen Neubau auf Betonpfeiler, mit denen man den Bunker durchbohrte. Der Mitzlaff-Bau wurde zum Pfahlbau.

Diese Maßnahme störte das bauphysikalische Gleichgewicht der Bunkeranlage empfindlich, wie Haarrisse im gesamten Bauwerk zeigten. Und wischen Bunker und Ausstellungshaus entstand so ein Hohlraum von bis zu 20 Zentimetern Höhe. Vermutlich konnte sich dort über die Jahre Wasser sammeln, das dann unkontrolliert in die Kunstdepots im Inneren des Bunkers gelangte.



Aus diesem Grund spielte der Tiefbunker eine entscheidende Rolle im mehrjährigen Diskussions-prozess um Neubau oder Generalsanierung des Gebäudes am Friedrichsplatz. Vor allem aufgrund der horrenden Kosten der Bunkersanierung, entschied sich der Mannheimer Gemeinderat im Juli 2011 für einen Neubau und den dafür erforderlichen Abriss des Mitzlaff-Baus. Dieser wird bis 2017 mit Hilfe einer 50-Millionen-Euro-Spende von Josephine und Dr. h.c. Hans-Werner Hector sowie einem Beitrag der Stadt Mannheim von 10 Millionen Euro realisiert.

NEWS FROM 26.08.2014 49 Tonnen in Aktion

NEWS FROM

49 Tonnen in Aktion

Der Rückbau des Mitzlaff- Baus schreitet zügig voran. Gut zwei Wochen nach Baustelleneinrichtung beisst sich ab heute ein fast fünfzig Tonnen schwerer Longfront-Bagger in die Fassade des nördlichen Anbaus der Kunsthalle Mannheim: Die heiße Phase des Abbruchs ist eingeleitet. Während der große Abbruchbagger mit einer Arbeitshöhe von 21 Metern und einer Reichweite von 13 Metern auf der Ostseite des Gebäudes die Fassade abbricht wird die westlich gelegene Seite im Inneren entkernt.

Jeder Schritt des Rückbaus beginnt zunächst im Osten des ehemaligen Ausstellungshauses, wird dann im Westen fortgeführt und in der Mitte des Gebäudes beendet. Mit dieser Vorgehensweise wird während des gesamten Abbruchs die inhärente Baustatik des Gebäudes genutzt. Abbruchmaterialien und Bauabfälle werden noch vor Ort in Container ökologisch sortiert und nach Möglichkeit der Wiederverwertung zugeführt.

Lärmbelästigungen lassen sich zwar leider nicht vermeiden, werden aber so minimal wie möglich gehalten. So wird es beim Rückbau keinerlei Sprengungen geben. Denn die Gebäudeteile werden mit der Zangen- und Meißelmethode abgerissen. Zudem wird mit einer Arbeitszeit von 7 bis 18 Uhr das Schlafbedürfnis der Anwohner respektiert. Samstags – der sechste Werktag jeder Woche – wird gearbeitet, jedoch auf lärmintensive Arbeiten verzichtet.



Ab Mitte September wird im Außenbereich die Tiefbunker-Decke sichtbar werden, auf der das Gebäude errichtet wurde. Der unterirdische Rückbau ist bis Ende des Jahres geplant. Dann beginnt für die Kunsthalle ein neues Kapitel in ihrer Geschichte: Voraussichtlich Ende Januar wird in feierlichem Rahmen der Grundstein für den Neubau der Kunsthalle Mannheim gelegt.

NEWS FROM 11.08.2014 Beginn der Abrissarbeiten

NEWS FROM

Beginn der Abrissarbeiten

Am 11. August startet der Bauprozess am Friedrichsplatz. Nachdem das Regierungspräsidium Karlsruhe am 29. Juli 2014 die Genehmigung für den Abbruch von Mitzlaff-Bau und Tiefbunker sowie den Teilabbruch des Athenetrakts der Kunsthalle Mannheim erteilt hat, stellt die beauftragte Firma Schleith GmbH im ersten Schritt den Bauzaun an den Grundstücksgrenzen auf. Der Zugang zum Jugendstilbau und den aktuellen Ausstellungen ist ohne Beeinträchtigungen gewährleistet.

Der geschlossene, ca. 2 Meter hohe Zaun umschließt auf 250 Meter Länge den gesamten nördlichen Anbau der Kunsthalle Mannheim. Er besteht aus Holzpanelen, die modulweise aufgestellt und durch schwere Betonfüße stabilisiert werden. Sobald der Zaun steht, beginnen der Erdaushub bis auf die Betondecke des Tiefbunkers sowie die Entkernungsarbeiten im Inneren des Mitzlaff-Baus. Die Abbrucharbeiten werden spätestens zum 31.12.2014 beendet sein. Während die Ausführungsplanung im Januar 2015 zum Abschluss gebracht wird, beginnt die ca. einjährige Phase des Rohbaus.

NEWS FROM 08.07.2014 Der Abriss rückt näher

NEWS FROM

Der Abriss rückt näher

Nach dem Auszug der Sammlungen kommt nun der nächste Schritt – der Rückbau des Mitzlaff-Baus. Voraussichtlich von Anfang August bis Ende Dezember 2014 wird er dauern. Hunderte Tonnen von Material werden in dieser Zeit abgetragen. Beeinträchtigungen für Anwohner und Besucher der Kunsthalle Mannheim lassen sich bei einem solchen Vorhaben nicht vermeiden, sie sollen aber so gering wie möglich ausfallen. Den Rückbau wird die Schleith GmbH ausführen – eine Firma, die bereits mehrere Bauprojekte in Mannheim betreut hat und sich mit der städtischen Situation am Friedrichsplatz bestens auskennt.

Um den gesamten Mitzlaff-Bau wird zunächst einen Bauzaun aus Holspanelen errichtet. Er wird zwei Meter hoch sein und auf der Grundstücksgrenze zwischen Bürgersteig und Grünflächen verlaufen. Der Zaun endet an der Roon- und Tattersallstraße am Jugendstil- gebäude. Somit wird gewährleistet, dass die Besucher die Ausstellungen der Kunsthalle Mannheim jederzeit über das Löwenportal in der Moltkestraße betreten können. Zur Baustelle wird es drei Zufahrten geben: Eine am Friedrichsplatz und jeweils eine in der Roon- und in der Tattersallstraße. Eine Sperrung der Straßen und Gehwege ist nicht vorgesehen. Lediglich für Sondermaßnahmen sind Tagessperrungen von Teilflächen möglich. Die bestehenden Parkplätze in der Roon- und Tattersallstraße bleiben bis auf eine Rangierfläche für zu- und abfahrende Lastwagen erhalten. Der Abbruch wird mit wenigen Großgeräten mittels Zangen- und Meißelmethode vorangetrieben. Diese Methode gilt dank ihrer niedrigen Schlagfrequenzen als besonders erschütterungsarm. Dies ist schon aus Sicherheitsgründen für den fortlaufenden Museumsbetrieb im Jugendstilgebäude zwingend erforderlich.



Sprengungen wird es keine geben. Damit Nachbarn und Anwohner auch weiterhin ruhig schlafen können, wurde die Arbeitszeit während des Rückbaus von Montag bis Samstag auf 7 bis 18 Uhr festgelegt, wobei samstags grundsätzlich weniger lärmintensive Arbeiten ausgeführt werden. Auftretender Staub wird durch eine Wasserberieselung und durch Wasserspritzen gebunden. Der Baumbestand auf dem Areal der Kunsthalle Mannheim wird nahezu komplett erhalten. Lediglich zwei bereits erkrankte Bäume werden gefällt. An dieser Stelle wird die Kompaktstation zur Stromversorgung der Kunsthalle Mannheim im Boden versenkt.

NEWS FROM 03.03.2014 Heiße Phase: Auszug der Sammlungen

NEWS FROM

Heiße Phase: Auszug der Sammlungen

Während Tausende Besucher durch den sanierten Jugendstilbau und die Blockbuster-Schau „Dix/Beckmann: Mythos Welt“ flanieren, herrscht hinter Feuerschutz- und Sicherheitstüren im Mitzlaff-Bau und Tiefbunker eine angespannte Arbeitsatmosphäre. Hier verpackt ein sechsköpfiges Team aus Restauratoren und Helfern seit der Abschiedsausstellung NUR SKULPTUR! dreidimensionale Kunstwerke, tonnenschwer und federleicht, raumgroß und winzig klein. Die Sammlung der Kunsthalle Mannheim mit rund 1200 Gemälden, 700 Skulpturen und 100 gerahmten Grafiken wird vor dem Abriss der Gebäude in Sicherheit gebracht.

Die gute Nachricht zuerst: 240 Spitzenwerke finden in der Sammlungspräsentation ARCHE eine neue Heimstatt während der Bauzeit. Um Manets Schlüsselbild „Die Erschießung Kaiser Maximilians von Mexiko" spannt sich der Bogen von der Romantik über die Epoche der Moderne bis zu Francis Bacons „Schreienden Papst". Dabei zeigen sich 92 Gemälde im frisch restaurierten Zustand – vielen BildPaten und Förderern, aber auch der Stadt Mannheim sei Dank! Eingerichtet wird die ARCHE in der Bel Etage des Jugendstilbaus mit ihren acht atemberaubenden Tageslichträumen. Die Eröffnung ist am 17. April 2014 (Gründonnerstag).

Der Großteil der Sammlung jedoch, unter dem Gesichtspunkt der Kostendisziplin in drei Kategorien sortiert, verlässt den durch Wassereinbrüche gefährdeten Tiefbunker wie auch die abgenutzten Räume des Mitzlaff-Baus und wird bis zur Fertigstellung des Neubaus an verschiedenen Orten ausgelagert. Eine extreme logistische und organisatorische Herausforderung für das gesamte Kunsthallenteam. Nicht nur Wissenschaftler und Restauratoren sind in die Vorbereitung seit 2012 eingespannt, sondern auch Registrarin, Fotograf und Sicherheitsbeauftragter.

Nachhaltiger Nebeneffekt dabei ist: Das für ein Museum existentielle, jedoch nach außen hin unsichtbare Aufgabenfeld „Sammlungsverwaltung" erreicht mit dem fundamentalen Umbruch ein neues Qualitätsniveau. 2017 werden die Bilder und Skulpturen in die neuen maßgeschneiderten Sammlungsräume und das hocheffiziente Depot-Untergeschoss des Neubaus zurückkehren. Der Kunstschatz der Stadt Mannheim ist damit dauerhaft gerettet.




NEWS FROM 28.01.2014 Die Publikation zum Wettbewerb

NEWS FROM

Die Publikation zum Wettbewerb

Aus dem internationalen Architekturwettbewerb zum Neubau der Kunsthalle Mannheim ging Ende 2012 der überarbeitete Entwurf von gmp als Sieger hervor. Als umfassende Dokumentation des Wettbewerbs und eines interdisziplinären Symposiums über Museumsarchitektur, das anlässlich der Preisträgerausstellung im Oktober 2012 stattfand, ist nun ein Kunst- und Architekturbuch der Extraklasse im Kehrer-Verlag Heidelberg erschienen.

29 Architekturbüros aus aller Welt nahmen 2012 am Wettbewerb zum Neubau der Kunsthalle Mannheim teil. Als "Spiegel der derzeitigen Architekturentwicklungen der Welt" bewertete der Vorsitzende des Preisgerichts die Qualität der eingereichten Entwürfe. Die Publikation präsentiert auf 160 Seiten mit über 200 Farbabbildungen der originalen Pläne die vielseitigen Ideen der Architekten und liefert damit den Status quo gegenwärtiger Museumsarchitektur.

Der Siegerentwurf des Hamburger Architekturbüros gmp (Gerkan, Marg und Partner) überzeugt mit einem zeichenhaften Auftritt, einem atemberaubenden Raumerlebnis sowie intelligenter Funktionsqualität. Bis 2017 wird ein "Schatzhaus" für die Mannheimer Sammlung moderner und zeitgenössischer Kunst im Herzen Mannheims entstehen.

Die hochkomplexe Bauaufgabe Museum ist eine Königsdisziplin, die auch von museologischer Seite mit Nachdruck untersucht wird. In neun Textbeiträgen fragen Ausstellungsmacher, Museumsplaner, Kunsthistoriker und Architekturkritiker, was es heißt, neue Räume für Kunst zu denken.

Herausgegeben von Ulrike Lorenz Texte von Dieter Bogner, Markus Brüderlin, Pablo von Frankenberg, Gert Kähler, Gottfried Knapp, Ulrike Lorenz, Luise Reitstätter, Angelika Schnell, Anne Vieth ISBN 978-3-86828-461-4 Euro 29,90 (erhältlich im Museumsshop an der Moltkestraße)

NEWS FROM 28.01.2014 Abschluss der Vorentwurfsplanung

NEWS FROM

Abschluss der Vorentwurfsplanung

Fristgerecht lieferte gmp am 25. November 2013 zwei dicke Aktenordner mit der Vorentwurfsplanung bei Bauvorstand und Projektsteuerer ab. Nach Prüfung und Kostencontrolling gab der Stiftungsrat am 18. Dezember die Planung frei. Am 28. Januar 2014 stellte die Stiftung die Ergebnisse der Öffentlichkeit vor. In der Vorentwurfsplanung wurde der Wettbewerbsentwurf überarbeitet und optimiert. Dabei wurden Verbesserungen in den funktionalen Zusammenhängen sowie der denkmalgerechten Anbindung an den Jugendstilbau erreicht.

Die Vorentwurfsplanung beinhaltet u.a.: Die vollständige Überarbeitung des Untergeschosses mit den Depot- und Technikflächen und die Einführung eines Split-Levels für maximale Nutzungseffizienz /// Neuplanung des Untergeschosses Athene-Trakt mit Schreinerwerkstatt und technischer Anlieferung /// Optimierung der Kunstanlieferungszone im Erdgeschoss und der Verkehrsinfrastruktur für Kunst im gesamten Gebäudekomplex (z.B. durch einen zweiten Lastenaufzug Kunst) /// Überarbeitung der Besucherservice-Zonen im Erdgeschoss: Verlagerung aller Garderoben und Toiletten in das Erdgeschoss, Verbesserung der Besucherorientierung /// Überarbeitung der inneren Anbindung des Neubaus an den Jugendstilbau über den Athene-Trakt (Treppenanlage, Besucherfahrstuhl) /// Verlagerung des Schaudepots vom Untergeschoss in das 2. OG zur Optimierung von Sicherheitsaspekten und Besucherorientierung /// Optimierung und teilweise Neuplanung des Kunstvermittlungskubus sowie von Werkstatt- und Bürozonen. Entwickelt wurden die Rahmenkonzepte für die kostenintensivsten Themen Tragwerksplanung (Statik und Baukonstruktion), Technische Gebäudeausrüstung (Heizung/ Kühlung, Lüftung und Sanitär) sowie Brandschutz. Weil Planungsprozesses methodisch immer von Innen nach Außen erfolgen, ist das wichtige Thema der Fassade folgerichtig erst seit Dezember 2013 Gegenstand der Entwurfsplanung und wird derzeit unter Einbeziehung der Denkmalpflege vertieft. Das Thema Barrierefreiheit im Jugendstilbau wird unter Einbeziehung des Behindertenbeauftragten der Stadt Mannheim bearbeitet.

A city within the city Museum in motion Ambling Atrium Alleyways Mesh Hypertext Digital Manet Pioneering Exhilarating Production site Permeability Third place Laterna Magica
The new building of the Kunsthalle Mannheim is a ‘city within the city’. Directly neighboured by the famous inner city squares, a central day-light atrium is surrounded by seven well proportioned exhibition ‘houses’ which are connected via bridges, planks, patios and squares. So the new building is a microcosm in a macrocosm.
By activating its collection Kunsthalle Mannheim manages to create a fascinating spatial structure with new works and topics with surprising constellations. The interaction of architecture, exhibition and art projects results in an impressing venue for people, art and a current discourse. The Kunsthalle Mannheim sets the audience in motion, physically, intellectually and emotionally: it intends to encourage and excite, delight and enchant.
The Kunsthalle’s urban architecture consists of perfectly placed and combined cubes. New approaches to art present itself depending on the visitor’s perspective. Of course there are thematic and guided tours but the exhibitions also offer to amble at one’s fancy. As there is no set interpretation of art just strolling at one’s own pace is intended. Anyone may use the house according to their own wishes: eat, shop, go online, seek shelter from the rain, hold interesting conversations or just enjoy the diverse rooms of concentration and deceleration.
The core of the new building is a 700 sqm day-light atrium freely accessible via the impressive main entrance on Friedrichsplatz. During the day this area has the atmosphere of an urban square where you meet, stroll or dwell. In the evenings it can turn into an event venue including the museum-owned catering and bar service.
Gmp’s innovative design idea for the new building uses urban elements and principles of cultural compaction. Story high glazed alleys of more then 3.5m width are positioned between the seven free standing ‘exhibtion houses’ and offer free view of the surrounding streets and Friedrichsplatz.
The new complex is covered by a shimmering, translucent screen. This mesh is a metal fabric in a bronce tone encompassing the entire new building. Functioning as a filter and a cover the mesh also refers to the main theme of the art hall: the different perception of the moving spectator as active participant in the reception of art. Simultaneously the elegant and fine mesh serves as distinctive feature of the Kunsthalle Mannheim.
By offering digital applications the Kunsthalle Mannheim broadens its realm of experience and thinking. Through comprehensive tagging the physically palpable world of the museum can be searched like any internet site: the art hall’s show rooms turn into a walk-in hypertext. One catchword leads to another and so the journey develops further and further.
Mannheim’s Kunsthalle pursues a comprising digital strategy, setting innovative impulses and developing online products and offers. It doesn’t aim at competing with the orignal or smothering it with infobesity. Its objective is to prepare the visitors for their personal encouter with art in a diverse, intelligent and innovative way. The real show room is enhanced by a virtual level – including genuine works specifically designed by artists for the Kunsthalle’s online world.
The Kunsthalle Mannheim’s worldwide reputation is partially due to Edouard Manet’s monumental painting of time „The Exectution of Emperor Maximilian“. Aquired at that time through donations by nine citizens of Mannheim it complements the collection. Of this painting only three versions exist, the final and biggest work, painted in 1868–69 is also the most famous. In his critical depiction, Manet breaks with the academic tradition and propagates a new kind of unadorned portrayal of the world. This makes him the most important precursor of modern art. In future this large format will be newly and effectively set varying with contemporary and modern pieces in a gallery in the newly built complex.
The Kunsthalle Mannheim also pioneers in the art dialogue. Making art publicly available was still uncommon when founding curator Franz Wichert declared his motto “art for all” in 1909. Democatically minded Wichert developed didactic exhibitions and an “academy open to all”, quenching the educational thirst of the working class. To this day the Kunsthalle Mannheim consisders itself a special seat of learning and intelligent recovery – with a playful, dialogic and experimental approach.
The team for communication of art at the Kunsthalle Mannheim is profoundly convinced that art conveys an exhilarating experience, based on the visitors’ contemplations or will for dialogue and cultural exchange. The team though does not aim at proclaiming truths about art nor does it want to lecture to its guests what is right or wrong. Much rather they’d indulge in being open minded and inviting the audience to share this view. Art raises more questions than answers.
The Kunsthalle Mannheim prospectively seeks to intensify its cooperation with contemporary artists. Thomas Hirschhorn, Michaela Melián and James Turrell have recently created installations directly related to the spatial conditions and the collection. Through this the Kunsthalle itself turns into a site of artistic creativity. The visitor can directly participate in the creation of new works. Rarely do you have the chance to get so close to art, to the origin of an idea.
The Kunsthalle’s new building offers an open structure, transparent and permeable, with flowing transitions from the outside to the inside or vice versa. Each element, each building for itself is distinguishable. Surrounded by a translucent draped façade there are still many possibilities for a clear view of the city, the Wasserturm, the park and the art nouveau wing. The architecture proves to be a continuation of the urban surrounding.
Not only does the Kunsthalle Mannheim offer itself as a third place to many visitors it also allows for a possible transcendency. On the outside the Kunsthalle presents itself as an unusual and quaint place. On the inside the spatial experience of “a city within a city’ reveals itself: aesthetically, emotionally and socially. Moving towards the original the familiar urban functionalism decreases steadily. Programme and the experience of art offer conceptual spaces: critical and multidimensional, innovatively and interdisciplinary. There are more questions than answers. There are barbs and contradictions. Facing the work, an intellectual and perceived spatial freedom opens, as a complementary opposite to the familiar external, urban surrounding lying beyond the cubes. The intimate dialogue with the original opens possibilities for self-empowerment, reflection and transcendency.
When the Kunsthalle Manheim closes in the evenings the visitors have the posibility to step into a magical circle of light emitted by a digital laterna magica infront of the new building. This interactive projection connects the histories of the city, the musem and the arts. The visual timeline is easily navigable with gestures and the compass takes you to the many sculptures surrounding the Kunsthalle and other fascinating places in Mannheim.

Knowledge-Check

Fundraising campaign
How high is the new Kunsthalle Mannheim?
60 m
18 m
21,50 m
Directly opposite the Kunsthalle you find one of Mannheim’s impressive landmarks, the Wasserturm. Completed in 1889 the tower supplied the ‘city of squares’ with drinking water for 30 years. It functioned as reservoir up until the turn of the millennium. The Mannheim Wasserturm is 60 metres high not the new annex of the Kunsthalle. Try again please.
With its curvy swingy façade the 1907 art nouveau wing of the Kunsthalle is an extraordinarily modern and sculptural building. The main entrance’s median risalit protrudes  with the outside staircase and the Lion’s portal overtowered by the imposing dome hall. In its  middle this houses the famous bronze sculpture ‘Großer Fisch’ by Constantin Brancusis. Above it beams the light sculpture „Starbrick“ by Olafur Eliasson constisting of 35 star-shaped modules. The dome hall in the art nouveau wing rises 18 metres high, not the new annex of the Kunsthalle. Try again please.
Correct!  Kunsthalle Mannheim is situated at Friedrichsplatz one of the most beautiful places of the city.
In combination with the historical ensemble of buildings this urban centre receives a stately completion through the Kunsthalle’s contemporary extension. With a height of 21.50 metres the new part of the Kunsthalle integrates smoothly in the surrounding structures. Whilst the adjoining residential buildings to the east rise up to 27 metres, the crest of the adjoining Maritime hotel is 30 metres high.
How much steel was used in the new building of the Kunsthalle Mannheim?
7.300 tons
4.700 tons
2.000 tons
Robert Delaunays „Fenster zur Stadt“ (1910-14) is one of the pictures favoured most by the audience of the Kunsthalle. In accordance with the cubistic style the French artist shatters the crowded Parisian roofscape infront of his window into a colourful flickering full of light and lucency. The top of the picture is dominated by the silhouette of the Eifeltower in vivid shades of purple and red. 7.300 tons of steel were necessary for this construction of the 19th century, not for the new annex of the Kunsthalle. Try again please.
2,3 million people live and work in the Rhein-Neckar region. In this culturally rich economic area various lines of transport connect the rural areas with the urban centres.
There are three Rhein crossings between the twin towns of Mannheim and Ludwigshafen. Built in 1972 the Kurt-Schumacher bridge is the youngest structure. 4.700 tons of steel were necessary alone for the track supports, not for the new annex of the Kunsthalle. Try again please.
Correct! In addition to 10.500 m3 of concrete, 2.000 tons of steel were used for the framing of the Kunsthalle Mannheim.
How big is the entire exhibition space of Kunsthalle Mannheim?
700 sqm
5.000 sqm
36.000 sqm
The architectural core of the new building is a day-light atrium, surrounded by multistoried exhibition cubes like houses around a urban market square. The atrium offers an imposing possibility on an area of 700sqm, allowing the audience to explore the exhibitions in the new annex or the art nouveau wing. Try to estimate the entire size of the exhibition area of the Kunsthalle Mannheim.
Correct! The entire size of the exhibition area measures 5.000 sqm: including seven large-dimensioned exhibition rooms between 250 and 400 sqm  and a terrasse for sculptures  in the new annex and eight skylighted galleries and the graphic collection rooms in the historical art nouveau wing.
Located five kilometres further to the east the SAP arena with 36.000 sqm of space hosts big sports events like ice hockey, handball or indoor football as well as concerts of all kind.
The drum kit in the Kunsthalle’s collection is a mere 34cm high – and sewn of soft canvas. This miniature drum kit is part of Claes Oldenburg’s legendary „Soft Sculptures” impressing the gallery’s visitors with its expressive softness for almost half a century. Try to estimate the entire size of the exhibition area of the Kunsthalle Mannheim.
Of how many cubes is the new building “a city within the city” composed?
7
26
144
Correct! The the new building’s design idea is based on the principle ‘a city within the city’ – a tribute to Mannheim’s baroque squared city centre.
The central day-light atrium is surrounded by seven well proportioned exhibition ‘houses’ which the visitor can reach via bridges, planks, patios and squares. Whilst the show rooms which seem to float allow for full concentration on the arts, the open gaps allow views of the surrounding streets and Friedrichsplatz.
One of the most famous toys of the 1980s was the colourful magic cube. The aim being to speedily match up all six sides with one colour each by spinning the mixed up adjustable cubes. The toy consisted of 26 small cubes, but the annex to the Kunsthalle doesn’t. Try again please.
In 1607 the city centre of Mannheim was planned on a rectangular grid. This resulted in 144 squares – surrounded by houses – urban space also allowing for scattered green lots or market squares. This is why Mannheim is also known as ‘city of squares’. Located on the eastern border of the city centre you find Friedrichsplatz and the Kunsthalle Mannheim. With its inviting front it also extends the urban space. In order to find out of how many cubes the new annex of the Kunsthalle Mannheim is composed, please try again.
Who designed the new part of the Kunsthalle Mannheim?
Hans-Werner und Josephine Hector
von Gerkan, Marg und Partner
Hermann Billing
Extending the Kunsthalle Mannheim with a new building would have been virtually impossible without the generous contribution of 50 million euros by Hans-Werner and Josephine Hector. The Hectors are therefore the main patrons of the building project but not it’s architect. Try again please.
Correct! All in all 29 architectural firms from all over the globe took part in the design competition for the new building of Kunsthalle Mannheim. The architectural firm Gerkan Marg and Partner outdid their national and international competitors with its innovative concept of ‘a city in the city’. Established in 1965 and with more than 500 employees in 10 branches gmp is a globally operating architectural firm. In both national and international competitions gmp has received 580 prizes, coming first more than 280 times, as well as being awarded several times for outstanding architecture.
In 1907 Mannheim celebrated its 300 year city anniversary. The occasion on which the exhibition hall, the current art nouveau wing, designed by the art nouveau architect Herrmann Billing from Karlsruhe was opened. Billing purposely positioned the building on Moltkestreet in order to leave room for a monumental building facing Friedrichsplatz and Mannheim’s Wasserturm. The First world war thwarted the realization of this plan. In 2017 the new part of the Kunsthalle will be constructed on this historical building site. Try again please to find who designed the new building.
Correct!
...would be correct!
Unfortunately that was wrong!
Sorry, try again please!
Could be better!
That was great!
Zurück
continue
Knowledge-Check repeat

Fundraising campaign

International competition
For more than a century the Kunsthalle Mannheim has stimulated enthusiasm and understanding for the Arts. In 2017 the opening of the new building at Friedrichsplatz will reveal: made-to-measure architectural museum design for a young and youthful audience and for a future-oriented exhibition programme. ‘Budget-wise we are on target’, the satisfied head of construction, Dipl.-Ing. Hanno Diehl  sums up the situation. “ The existing financial gap will be tied over through joint effort and donations,” Dr. Manfred Fuchs head of the foundation “Kunsthalle Mannheim” confirms. The icon of the foundation’s campaign is the well-known pink watering can.


This pink watering can is filled steadily with big and small (money-)drops of water which will help to revive the Kunsthalle and regain its status as a renowned museum in Germany and beyond.  Through the ‘watering can campaign’ the foundation’s support group intends to activate many thousands of small donations  of 10 Euro upward.  “ With their donations Mannheim’s residents say YES to the awakening of their Kunsthalle and YES to the future of their city.”, as the support group emphasizes their motto ‘Kunsthalle for all and Kunsthalle through all’.
Become a sponsor!

Stifter Gießkanne der Kunsthalle Mannheim

International competition

Facts
On July 19th 2012 a jury of 15 renowned jurors together with a team of eight advisors awarded the best designs for the new Kunsthalle Mannheim in an international architectural competition.  All in all 29 architectural firms from all over the globe took part in this closed, anonymous competition, including well-known builders of museum complexes as well as young inspired architects. After two days of intensive consulting three coequal prizes were awarded to Gerkan Marg and Partner (gmp), Peter Pütz Architekten and Staab Architekten GmbH. Additionally the jury acknowledged five further designs.
Taking into account the recommendation of the jury, consisting of experts on architecture and museums, representatives of the foundation and the four municipal council fractions, the foundation “Kunsthalle Mannheim” entered into negotiations with the three laureates who willingly revised their original designs. The final decision was made on Dec 5th 2012, in favour of the architectural firm gmp. Gerkan Marg and Partner from Hamburg will be building the new addition to the Kunsthalle Mannheim. The biggest German architectural firm won out over their German and international competitors with their spectacular concept of space.


Experience the museums quarter Kunsthalle Mannheim
with this interactive graphic

Organisation & Finances

Neubau / Faktencheck



1 //
Neubau

2 //
Mitzlaff-Bau
, 1983 (Pfeilergründung durch Bunker, überlappt diesen nur teilweise)

3 //
Kriegsbunker
, 1941 (seit 2000 Sammlungsdepot)

4 //
Athene-Trakt
, 1907 (Anschluss für Museumserweiterung am Friedrichsplatz, seit 1983 im Innern total zerstört)

5 //
Jugendstilbau
, 1907 (hochrangiges Baudenkmal)


Stark vereinfachte Darstellung / Stand Frühjahr 2013 /
© 2014 Jäger und Jäger
GMP’s new building replaces the Mitzlaff building as well as the former deep bunker. In order to integrate the art nouveau building gmp reconstructed and modernized the destroyed inside of the former Athene wing from 1907 according to standards of monument preservation. The core of the new construction is an open light atrium of 700 sqm. With 200 sqm the new function area will be double the size to the former. The premises for the communication of art will be tripled. The core of the new building is the exhibition area which has been extended by 1300 sqm. The art depots have increased up to 45% of climatised room and a complex loading zone for worldwide art loan transactions will finally be installed. The façade facing Friedrichsplatz measures 77 metres in width, the setback still being 13 metres. Towards the sides on Tattersallstreet and Roonstreet the depth of the building will be increased by two metres. With a height of 21.5 metres the new Kunsthalle will integrate smoothly in the surrounding structures. The closed post-and-beam façade compliant with passive house standard will receive outer walls of reinforced concrete with thermal insulation as well as triple glazing. Premium mesh surrounds the complex as an open translucent draped façade.

Organisation & Finances

Questions & Answers

Fragen & Antworten
in german only

Wer baut die neue Kunsthalle?

Bauherr ist die private Stiftung Kunsthalle Mannheim. Die Stadt Mannheim als Eigentümerin des Grundstücks Friedrichsplatz 4 ist Mitgründer der gemeinnützigen Stiftung.

Was kostet der Neubau und wer finanziert ihn?

Das Investitionsvolumen für den Neubau inklusive Architekturwettbewerb beträgt 68,3 Mio Euro. In das Budget fließen Mittel
- der Hector Stiftung II Kunst gGmbH: 50 Mio Euro
- der Stadt Mannheim: 10 Mio Euro
- aus dem Land Baden-Württemberg (Städtebauförderung u.a.)
- aus privaten Zuwendungen der Bürgerschaft und Wirtschaft.

Die 50-Millionen-Euro-Spende

Steht die 50-Millionen-Euro-Spende für andere Projekte zur Verfügung?
- Nein. Die Aufsehen erregende Spende des SAP-Mitbegründers Dr. h.c. Hans-Werner Hector ist an den einstimmigen Grundsatzbeschluss des Gemeinderats vom 26. Mai 2011 zum Neubau am Friedrichsplatz und dem dafür notwendigen Abriss von Tiefbunker und Mitzlaff-Bau gebunden.
- In einem Interview mit dem Mannheimer Morgen bekräftigte Herr Hector im Januar 2014 darüber hinaus öffentlich, dass seine Spende mit keinen Auflagen verbunden ist.

Warum Neubau statt Sanierung?

- Der Neubau ist in der langfristigen Bewertung von Investitions- und Betriebskosten eindeutig die wirtschaftlichste Alternative.
- Das neutrale Ingenieurunternehmen Assmann bewertete 2011 die Baukosten einer Minimalsanierung mit über 30 Mio Euro und eine Generalsanierung inklusive Eingriff in den Rohbau mit ca. 50 Mio Euro, ungeachtet bleibend hoher Energiekosten.
- Assmann konstatierte gravierende Bauschäden, die Überalterung der Gebäude- und Sicherheitstechnik sowie konstruktive und technische Mängel (Durchfeuchtung der Fassaden; kein Museumsklima; Infrastruktur, Kunstanlieferung und Lichtschutz unzureichend; Barrierefreiheit, Brandschutz und Fluchtwege mangelhaft).
- Infolge des unlösbaren statischen Verbunds von Tiefbunker und Mitzlaff-Bau wurden die Sanierungsrisiken als unwägbar eingeschätzt.*
- Darüber hinaus evaluierte Assmann kritisch die Rohbauqualität des Mitzlaff-Baus mit springenden Geschossebenen und partiellen Geschosshöhen von nur 2,50 m. Das Aufschneiden des Rohbaus etwa im Bereich Eingang ist sehr teuer.
- Die Planung des Hintereingangs am Friedrichsplatz erwies sich als städtebauliche Fehleinschätzung. Das trug zum Ruf- und Publikumsverlust der Kunsthalle bei.
- Der durch Sparzwänge zu klein dimensionierte Mitzlaff-Bau erlaubt keinen angemessenen Anschluss an die historische Bebauung des Friedrichsplatzes. Für die Anbindung an den Jugendstilbau der Kunsthalle wurde der unter Denkmalschutz stehende Athene-Trakt im Innern komplett umgebaut.
- Internationale Museumsstandards für Klima, Licht, Sicherheit und Infrastruktur sind im Mitzlaff-Bau nur unzureichend oder gar nicht zu erreichen.
- In der vorhandenen Gebäudestruktur können die notwendigen Ausstellungs-, Depot- und Verkehrsflächen sowie Barrierefreiheit und Serviceräume (Gastronomie, Empfang, Veranstaltung, Kunstvermittlung) nicht geschaffen werden.

[* Der Mitzlaff-Bau steht auf einer Pfeilerkonstruktion, die durch den Bunker gebohrt wurde, und überlappt diesen nur teilweise. Eine Nutzung des Bunkers wurde in den 1980er Jahren als nicht finanzierbar verworfen. 2000 wurde er dennoch zu Ausstellungs- und Depotzwecken ertüchtigt. Doch seit 2008 dringt unkontrollierbar Wasser durch Haarrisse im Kriegsbeton in das Gebäude und gefährdet akut die Kunstbestände. Der Tiefbunker wird vom Baukompetenzzentrum der Stadt Mannheim als nicht sanierungsfähig bewertet.]

Warum kein Neubau vor der Heiliggeistkirche?

Das Flurstück 4922 gehört der Max-Hachenberg-Schule und steht nicht zur Verfügung. Das freie Wiesenstück hat eine Fläche von 1.800 m², während das Planungsgebiet der Kunsthalle 6.500 m² umfasst. Der räumliche Ausgleich müsste durch Stockwerke erfolgen. Nicht annähernd erfüllt wird das Raumprogramm (Wechselausstellungsflächen, Kunstanlieferung im Erdgeschoss). Die Trennung der Ausstellungsflächen zerstört die historische Einheit der Kunsthalle und zersplittert die Sammlungen. Im Museumsbetrieb bedeutet das einen erhöhten Personal-, Finanz- und Logistikaufwand. Wer soll das bezahlen?
Der Mehrgeschosser auf dem Grundstück der Max-Hachenberg-Schule sprengt die städtebaulichen Proportionen innerhalb der historischen Umgebungsbebauung und verschlingt immense Investitionskosten, u.a. für die unterirdische Anbindung. Es steht keine private Spende dafür zur Verfügung. Bereits Architekt Hans Mitzlaff hat in den 1970er Jahren den Alternativ-Bauplatz für die Erweiterung der Kunsthalle geprüft und verworfen.
Ein Neubau auf grüner Wiese lässt die Sanierungsfrage des Mitzlaff-Baus völlig ungelöst. Die Barrierefreiheit für den Jugendstilbau bleibt ein Traum.

Welche Vorteile haben die Bürger vom Neubau?

1. Der Neubau des weltweit tätigen, größten deutschen Architekturbüros stärkt die Baukultur Mannheims und trägt zur Identifikation mit der Stadt und zum weltoffenen Selbstbewusstsein der Bürgerschaft bei.
2. Die neue Kunsthalle wird für die Bedürfnisse und Ansprüche einer jungen Generation der Zukunft gebaut. Sie ermöglicht zeitgemäße Ausstellungs- und Veranstaltungsangebote zu subventionierten Preisen und trägt damit langfristig zu einem erfüllten Leben aller Bevölkerungsschichten bei.
3. Mit dem Neubau kann die Kunsthalle ihren gesellschaftlichen Bildungsauftrag modernisieren und erweitern. Daran partizipieren alle. Nicht vermarktungsfähige Produkte wie Schulpartnerschaften, Behindertenprojekte, Medienkurse, Kindergeburtstage und Veranstaltungsreihen sowie der freie Eintrittstag "Kunsthalle für alle" bereiten auf die Herausforderungen der Zukunft vor.

Wie gehen Neubau und Denkmalensemble zusammen?

Die Qualitätsarchitektur bedeutet einen markanten zeitgenössischen Impuls für Friedrichsplatz sowie Oststadt und Schwetzinger Stadt.
Das sensible Zusammenspiel mit den historischen Nachbargebäuden hat in der Planungsarbeit von gmp höchste Priorität. In zeitloser Zurückhaltung bezieht sich der Neubau in seiner Breite und Höhe sowie dem 13 m tiefen Vorplatz direkt auf den Rosengarten. Mit 21,50 Höhenmetern liegt er deutlich unter der Traufhöhe vom Maritim-Hotel (30 m).
Der Neubau integriert den Jugendstilbau der Kunsthalle. Nach Denkmalschutz-Vorgaben rekonstruiert und modernisiert gmp den im Innern zerstörten Athene-Trakt. Der rund um den Jugendstilbau und auf der Moltkestraße geplante Skulpturenplatz bildet ein Grünflächenpendant zum Friedrichsplatz.

Warum entsteht der Neubau am Friedrichsplatz?

Die Kunsthalle Mannheim hat ihren historischen Sitz am Friedrichsplatz, direkt im urbanen Herzen Mannheims. Hier muss der neue Haupteingang des Hauses dem Publikum klare Orientierung und hohe Wertigkeit bieten.
Die Integration des Jugendstilbaus in das Konzept des Neubaus ist essenzieller Bestandteil der Entwurfsidee und des Museumskonzepts. Der Jugendstilbau wird über den Neubau barrierefrei erschlossen und ist Krönung des Museumsbesuchs.* Damit verfügt die Kunsthalle über ein Alleinstellungsmerkmal von hoher Strahlkraft.
Eine bauliche Trennung und Verlagerung des Neubaus würde nicht nur den Wettbewerbsvorteil, sondern auch die historisch gewachsene Identität und Struktur der Institution zerstören.

[* Der 1907 von Hermann Billing errichtete Jugendstilbau wurde bewusst in der "zweiten Reihe" an der Moltkestraße erbaut, weil das Grundstück zum Friedrichsplatz hin 1913/14 für einen Monumentalbau von Bruno Schmitz vorgesehen war. Doch der Erste Weltkrieg verhinderte dessen Ausführung.]

Welche Vorteile bietet der Neubau der Stadt Mannheim?

Der Neubau ist die wirtschaftlichste Alternative:
- Die 50-Millionen-Euro-Spende des Ehepaars Hector für den vom Gemeinderat beschlossenen Neubau am Friedrichsplatz ist ein Geschenk ohne Auflagen.
- Der Eigenanteil der Stadt am Neubau beträgt 10 Mio Euro. Die Stadt finanziert ihren Eigenanteil am Neubau nicht aus dem laufenden Haushalt, sondern aus Rücklagen aus dem Verkauf ihrer Anteile bei der MVV.
- Der Neubau wird unter energetischen und ökologischen Prämissen realisiert, die langfristig Betriebskosten steuern helfen sowie Barrierefreiheit und Brandschutz auf kostengünstigste Art sichern. Personalressourcen und Betriebsaufwände werden durch die hocheffiziente Infrastruktur optimiert.
- Die Kunsthalle stärkt ihren Eigenfinanzierungsanteil durch Erhöhung der Besucherzahlen und Direkteinnahmen im Museum (Eintritt, Restaurant, Shop).
2. Der Neubau bedeutet Investitionen und Arbeitsplätze:
- Die Stiftung Kunsthalle investiert Millionen in die Realisierung des Neubaus und fördert damit direkt die regionale Bauwirtschaft.
- Das Wirtschaftsunternehmen Kunsthalle ist selbst Arbeitgeber und Auftraggeber. Es beschäftigt externes Personal (u.a. Künstlerförderung) und kauft Güter und Dienstleistungen in der Stadt ein (Strom, Handwerker, Material, kreative Leistungen, Technik-Support, Catering u.v.m.).
3. Die neue Kunsthalle trägt durch Umwegrentabilität zum Wohl der Stadt bei:
- Die neue Kunsthalle als Leuchtturm der Kultur- und Freizeitinfrastruktur lockt Besucher aus der Region und Touristen aus Deutschland und dem umliegenden Ausland an, die Zusatzinvestitionen in Gastronomie, Einzelhandel und Nahverkehr tätigen. Kulturtouristen verlängern ihren Aufenthalt oder reisen sogar gezielt an.
- Angestellte und externe Beschäftigte der Kunsthalle (Ehrenamtliche, Pächter) und der Stiftung (Fachplaner, Bauwirtschaft) wohnen und investieren lokal.

Wer kontrolliert die Architekten?

Die Planung der Architekten wird in erster Linie vom Projektsteuerer im Hinblick auf Qualität und Kosten kontrolliert. Der Projektsteuerer wirkt dabei eng mit dem Bauvorstand zusammen.
Die Kunsthalle als Nutzer evaluiert die Planungsschritte anhand des Nutzungskonzepts unter Mithilfe von Fachberatern. So wird sichergestellt, dass die musealen Anforderungen auch tatsächlich umgesetzt werden.
Darüber hinaus sind weitere korrigierende Instanzen in den Planungsprozess einbezogen, wie z.B. die obere Denkmalschutzbehörde des Regierungspräsidiums Karlsruhe oder der Behindertenbeauftragte der Stadt Mannheim.

Warum ist der Mitzlaff-Bau kein Skulpturenmuseum auf Dauer?

Die Kunsthalle Mannheim ist kein Skulpturenmuseum per se. Sie beherbergt neben Schlüsselwerken von Edouard Manet über Max Beckmann bis Francis Bacon eine bedeutende Sammlung des französischen Impressionismus, des deutschen Expressionismus und der Internationalen Moderne.
Das Einmalige der Sammlungsstruktur ist die Balance von Malerei und Skulptur. Die Chance liegt in einer gleichrangigen Cross-Over-Präsentation der Gattungen und Stile.
Der Mitzlaff-Bau hat nie als Skulpturenmuseum funktioniert, weil 1. seine Statik dieser Funktion völlig widerspricht (Fußbodenheizung!) und 2. auch Skulpturen, insbesondere Holz- und Metallskulpturen, besondere Museumsbedingungen für Klima, Licht und Sicherheit benötigen. Von Anfang an wurde der Mitzlaff-Bau auch für die Präsentation großformatiger Malerei, vor allem nach 1945, genutzt.

Was soll mit dem Neubau erreicht werden?

1. Die Kunsthalle beherbergt eine der renommiertesten Bürgersammlungen der Moderne in Deutschland. Dieser Kunstschatz erhält einen würdigen Rahmen, der ihn schützt und unter optimalen Bedingungen zeigt. Internationale Museumsstandards sichern auch Wechselausstellungen und den Aufbau eines Partnernetzwerks.

Internationale Leihgeber fragen in sogenannten „Facility-Reports“ zahlreiche technische und bauliche Museumsstandards ab. Vor allem Richtwerte für klimatische und sicherheitstechnische Umgebungsbedingungen für Kunst sind Voraussetzung für Leihgaben wie auch für die präventive Konservierung der eigenen Sammlung. Das alles hat sich in den letzten 20 Jahren im internationalen Diskurs stark entwickelt. Der Neubau stellt folgende Klima- und Sicherheitsrichtwerte unter Beachtung der Energieeffizienz her: - Luftfeuchtigkeit um 50-55%, jahreszeitlich bedingter Änderungskorridor von bis zu +/-5%- Temperaturen gleiten zwischen 20°C im Winter und 24°C im Sommer, Vermeidung vertikaler Temperaturschichtungen - sehr geringer, regelbarer Luftwechsel im Raum: ca. 1-fach pro Stunde - Für Sonderbestände gelten je nach Materialbeschaffenheit strengere Klimawerte. - Moderate Klimaänderungen über den Jahresverlauf werden toleriert, wenn Kurzzeit- und Regelschwankungen von Temperatur und Feuchte ausgeschlossen sind. - Modernste Sicherheitstechnologie bei der Überfall-, Einbruch- und Brandmeldeanlage, Videoüberwachung, Einzelobjektsicherung und Sicherheitsverglasung. Die technischen und baulichen Anforderungen an den Neubau sind vertraglich fixiert. Bauprogramm und Raumbuch formulieren die Planungsgrundlagen.

2. Für das "Museum in Bewegung" werden die räumlichen, logistischen und technischen Voraussetzungen geschaffen. Das entspricht den Anforderungen eines an Neuem und Aktuellem interessierten Publikums, d.h. Dynamik im Programm, Vielfalt der Angebote, Weltoffenheit.

"Museum in Bewegung" heißt die Zukunft der Kunsthalle Mannheim. Alleinstellungsmerkmal ist die Integration von Jugendstil und neuer Architektur. Der Besuch der Kunsthalle wird zum bewegenden emotionalen Sinnerlebnis. Dazu trägt die atemberaubende Innenarchitektur von gmp bei (lichtdurchflutetes Atrium, "Stadt in der Stadt", holistische Transparenz der Doppelfassade). Der Friedrichsplatz strömt in das Gebäude hinein und wird selbst zum schönsten Ausstellungsstück. - Effiziente Infrastruktur und modernste Technik sind Voraussetzungen für den flexiblen Museumsbetrieb mit rhythmisch wechselnden Sammlungspräsentationen und parallelen Sonderausstellungen. Die charaktervolle Raumtypologie erlaubt ein vielschichtiges dynamisches Programm in Alt- und Neubau. Besucher aus nah und fern werden zum Wiederkommen animiert.

3. Die Qualitätsarchitektur des Neubaus von gmp wertet das städtische Umfeld auf, stärkt das gute Image Mannheims und erhöht die touristische Attraktivität.

Die Kunsthalle wertet das städtische Umfeld qualitativ auf. Stadtbild, Baukultur, Wirtschaft und Bildungslandschaft profitieren vom Neubau. Der zeitgenössische Architekturakzent stärkt und profiliert Mannheims schönstes Stadtquartier und das innerstädtische Freizeit-, Gastronomie- und Einzelhandelsangebot. Die Kunsthalle als niveauvolle Bildungsstätte und Ort ästhetischen Genusses wird zum Magnet für Einheimische und Kulturtouristen.
- Gastronomie (Restaurant, Cafeteria und Bar für verschiedene Ansprüche), Museumsshop und verschieden dimensionierte Veranstaltungsbereiche (Veranstaltungssaal 199 Plätze, Alte Bibliothek 50 Plätze, Atrium für Großveranstaltungen) tragen zur Belebung des Friedrichsplatzes und zur überregionalen Strahlkraft Mannheims bei.
- Intensivierte dauerhafte Berichterstattung richtet die überregionale Aufmerksamkeit auf Mannheim. Die Themen Kultur, Architektur und Nachhaltigkeit kommen der Stadtmarke zu Gute: Weg von der „Industrie-, Chemie- und Autostadt“ hin zur lebenswerten, kreativen Stadt. Positive Außenwirkung erhöht die Attraktivität der Stadt, auch für Unternehmen, die hier investieren wollen und qualifiziertes Führungs- und Nachwuchspersonal anziehen. Kaufkraft und Strukturwandel werden gestärkt.

Wer ist für das Baubudget verantwortlich?

Die Steuerung des Baubudgets liegt in der vertraglich fixierten Verantwortung von Projektsteuerer und Generalplaner.
Der Vorstand verantwortet gegenüber dem Stiftungsrat das Budget.
Die kostenrelevanten Entscheidungen zum Neubau fällt der Stiftungsrat.

Wie wird verhindert, dass die Baukosten explodieren?

Wir verhindern eine Explosion der Baukosten durch
- ein zweifaches, voneinander unabhängiges, laufendes Kostencontrolling auf der Grundlage eines gewerkeweise gegliederten Budgetplans
- ein straffes Projektmanagement in der Interaktion von Bauvorstand, Projektsteuerer und Generalplaner
- sach- und termingerechte Entscheidungen des Bauherrn
- die strikte Einhaltung des Terminplans.

Stimmt es, dass der Abriss teurer wird als geplant?

Nein. Der Abriss von Mitzlaff-Bau und Tiefbunker ist mit insgesamt rund 2 Mio Euro budgetiert. Darin nicht enthalten sind Nebenkosten wie die Planung der Abrissstatik und Entsorgungslogistik.
Ein Großteil davon wird durch die Städtebauförderung des Landes Baden-Württemberg gedeckt.
Die Förderrichtlinien des Landes machten einen Gemeindratsbeschluss zur Erhöhung des Eigenanteils der Stadt Mannheim notwendig, um die Städtebauförderung in voller Höhe abrufen zu können.

Wie wird die Öffentlichkeit informiert?

Die Öffentlichkeit wird je nach Prozessfortschritt regelmäßig über die Medien und die Website der Kunsthalle Mannheim informiert.
Die Kommunikation mit den Anwohnern geschieht turnusmäßig schriftlich.